Plan changes
Plan changes — record the acceptance criteria for plan changes in the workspace change log.
1. Prepare plan changes
Section titled “1. Prepare plan changes”Store the candidate manifest beside the application. A plan describes a transition from one specific live revision. Regenerate it if another writer commits first.
2. Read the current revision
Section titled “2. Read the current revision”curl --fail-with-body "https://api.boundarykit.com/v2/policies" -H "X-API-Key: $BKIT_KEY" -H "X-Organization-Id: $BKIT_ORG"3. Capture the result
Section titled “3. Capture the result”Record the acceptance criteria for plan changes in the workspace change log.
Inspect the receipt for Plan changes. Compare its organization and revision with the values in the fixture before interpreting the result.
4. Repeat the check
Section titled “4. Repeat the check”Repeat with the same fixture after promotion. A different rule ID identifies a semantic change even if both decisions allow the operation.